Industry

What materials should be prepared for the installation of MTU diesel generator set?

Diesel generator set installation before the need to do a good job of equipment installation drawings, product certification, confirm that the appearance is intact, complete accessories and so on, the following by professional diesel generator manufacturers – Jiangsu Meao Power Technology Co., Ltd. to introduce you one by one.

1. must have the diesel generator set installation drawings, product certificate, installation instructions, labor department quality inspection certificate, and technical data consistent with the physical.

2. the appearance of the diesel generator set should be intact, the equipment parts are complete, and the visible parts of the compression components have no collision damage deformation.

3. diesel generator set supporting accessories and auxiliary equipment should be complete and intact, and meet the requirements. Check and accept all equipment and parts according to the equipment list, record the defective parts and solve them in time, keep them properly after checking.

4. The specifications and models of all kinds of metal pipes, sections, meters, valves and fittings must meet the design requirements and meet the factory quality standards with good appearance and no damage, rust or other surface defects.

5. Organize materials to enter the site as planned and keep them well.

Jiangsu Meao Power Technology Co., Ltd. focuses on the development and manufacture of diesel generator sets, and has accumulated rich experience in manufacturing and service in this field. As a professional generator manufacturer, MEAOPOWER attaches great importance to product development, innovation and service quality, and maintains close strategic cooperation with famous domestic and international enterprises such as Cummins, Perkins, Doosan, Yuchai, Weichai, Shangchai, Wuxi Wandi, Lillesomer, Stanford, Marathon and so on.