1. After the generator set is started, check the parameters of the control box module, oil pressure, water temperature, voltage, frequency, etc.;
2. Under normal circumstances, the speed of the generator set directly reaches the rated speed after starting; Idle unit with idle requirements, idle time is generally 3~5min, idle time is not easy to be too long, otherwise it may burn out generator related components;
3. Check the leakage of oil, water and electrical equipment of the unit;
4. Check the tightness of each connection of the unit to see if it is loose and violently vibrating;
5. Observe whether various protection and monitoring devices of the unit are normal;
6. When the generator set reaches the rated speed and the parameters of no-load operation are stable, the power supply shall be closed;
7. Check and confirm whether the parameters of the control screen are within the allowed range, and check the vibration of the unit again, whether there are three leaks and other faults;
8. Overloading is strictly prohibited when the generator set is running.
Jiangsu Meao Power Technology Co., Ltd. focuses on the development and manufacture of diesel generator sets, and has accumulated rich experience in manufacturing and service in this field. As a professional generator manufacturer, MEAOPOWER attaches great importance to product development, innovation and service quality, and maintains close strategic cooperation with famous domestic and international enterprises such as Cummins, Perkins, Doosan, Yuchai, Weichai, Shangchai, Wuxi Wandi, Lillesomer, Stanford, Marathon and so on.